Week 5
This week had a few different tasks to be completed. Together we prepared our presentation, but were unable to give it due to time constraints, but will be giving it first thing next week. We also created a team poster for the work space with our head shots on it.
My more project focused work this week was working on creating all the shop drawings that we can use once we begin construction. I also continued working on our BOM so that we could have a better cost estimate to provide Tynan. We will be reaching out to local metal supplies within the next week to get some quotes for the materials required, as well as the fabrication of the third rail design. Because we are modifying the existing full scale track, we are expecting our overall cost to be below $2000.
My more project focused work this week was working on creating all the shop drawings that we can use once we begin construction. I also continued working on our BOM so that we could have a better cost estimate to provide Tynan. We will be reaching out to local metal supplies within the next week to get some quotes for the materials required, as well as the fabrication of the third rail design. Because we are modifying the existing full scale track, we are expecting our overall cost to be below $2000.
Comments
Post a Comment