Week 11
This week was largely focused on figuring out manufacturing of our design. With the help of the rest of the teams last week, we were able to finish moving the track to the new location which will enable us to finally begin constructing our designs, though we are very short on time due to how long it took to get it moved over. After reaching out to about 10 different suppliers it became obvious that it would be impossible to find any shop locally that would be able to bend our third rail they way that it was designed so Evelia tackled a quick redesign that utilizes a just a circular pipe instead which Brandon and Nik on the Bogie Team said would be able to work still.
Once Evelia finished the new third rail model, I compiled the drawings for all the metal components that we need and converted the models to .step files. These were sent out to Master Metal and Nor-Cal Metal Fabricators to get quotes and estimated turn around times for the work. As long as we can get a turn around time of less than 2 weeks, we should be able to finish our construction just in time.
Once Evelia finished the new third rail model, I compiled the drawings for all the metal components that we need and converted the models to .step files. These were sent out to Master Metal and Nor-Cal Metal Fabricators to get quotes and estimated turn around times for the work. As long as we can get a turn around time of less than 2 weeks, we should be able to finish our construction just in time.
Comments
Post a Comment