Week 3

This week was focused on modeling our final design revisions for our prototype build. While Evelia was focused on making the required changes to the third rail design, mainly involving modifying the mounting points to work with the existing track, I worked on designing the track modifications. Based on the advice from Danny we are planning to made the majority of the modifications using lumber with a sheet metal layer fixed to the outside to improve durability. However, to ensure that the junction is strong enough some addition supports need to be added on last two sections of the track after the split to support the additional rails, as well as ensure that they are in a fixed position and can't shift around. Figure 1 below shows the current track segment after the junction, while Figure 2 shows the segment before it. additional supports need to be added to make the segment's after closer to the segment before.

Figure 1: Track after the junction that is missing rails on one side.
Figure 2: Track before the junction that has all the rails.

Comments

Popular posts from this blog

Week 14

Project Beginnings

Week 5