Week 8
This week we were able to give our presentation, which is posted on the team blog from week 7. We were also unable to begin moving the track due to the weather but hope to get enough people together during or immediately after break to get it moved.
I have begun reaching out to local metal shops to see if anyone is able to fabricate our third rail design locally. The shops I am contacting are listed below.
I have begun reaching out to local metal shops to see if anyone is able to fabricate our third rail design locally. The shops I am contacting are listed below.
- Master Metal
- Accurate Tube Bending
- Alan Steel and Supply
- Sims Metal
- Vander-Bend